Enclave at Mequon Preserve South

Welcome to the Enclave at Mequon Preserve South Homeowners Association information page!

Announcements

2025 HOA Dues

December 13, 2024

The 2025 budget and dues invoice has been mailed out via U.S. Mail to all owners within the neighborhood.
The budget has also been posted to the DSI website and can be found by clicking on the ‘Documents” tab. 2025 HOA dues are due by January 31st, 2025.
Dues can be paid via your online account or by mailing in a check, whichever works best for you.
Please don’t hesitate to reach out if you have any questions – hoa@dsirealestate.com.

Winter Update

November 14, 2024

Snowy season is upon us. Vendors have 12 hours to clear HOA maintained areas, after snow fall has stopped. If you notice HOA maintained areas that are not being cleared, please reach out to us at hoa@dsirealestate.com.
If you are not sure what areas are/are not maintained by the HOA, please click the “Documents” button to the right to review the Snow Removal Map.
Homeowners are responsible for snow removal on their individual driveways, walkways, stoop, stairs, etc.

HOA Maintenance & Snow Removal

November 14, 2024

Please visit the ‘Documents’ tab for an HOA maintenance map. The HOA does not do the snow removal of the City Streets.
Homeowners are responsible for snow removal on their lot. The Developer (Veridian Homes) is responsible for snow removal on vacant and under construction lots. If there are issues, please contact Veridian directly at 608.226.3000.

Outdoor Fall Maintenance To Do’s

August 30, 2024

• Rake or blow leaves
• Clean up garden
• Clean up flower beds
• Trim trees and shrubs
• Clean rain gutters
• Apply winter lawn food
• Winterize tools
• Blow out sprinklers
• Cover hose bibs

Subscribe to our email list

Sign up to receive Enclave at Mequon Preserve South Association updates and
announcements.

Sign Up